<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Renovations &#8211; MEP Engineering</title>
	<atom:link href="https://www.mepengineering.com/category/renovations/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.mepengineering.com</link>
	<description></description>
	<lastBuildDate>Tue, 13 Dec 2022 14:27:48 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.mepengineering.com/wp-content/uploads/2022/10/cropped-NewLogoFavicon-32x32.png</url>
	<title>Renovations &#8211; MEP Engineering</title>
	<link>https://www.mepengineering.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Brown-Heatly Building 20-21 DM Upgrades (Phase 2)</title>
		<link>https://www.mepengineering.com/brown-heatly-building-20-21-dm-upgrades-phase-2/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Tue, 13 Dec 2022 01:30:52 +0000</pubDate>
				<category><![CDATA[Government]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=3169</guid>

					<description><![CDATA[MEP Engineering, Inc. served as the Prime Consultant on this TFC 20-21DM project to implement additional deferred maintenance upgrades at the Brown-Heatly State Office Building, now home to the Texas Department of Family and Protective Services (DFPS).  The project scope included the development of a multidiscipline facility assessment report to identify existing building maintenance deficiencies<br><a class="moretag" href="https://www.mepengineering.com/brown-heatly-building-20-21-dm-upgrades-phase-2/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p>&nbsp;</p>
<p><img fetchpriority="high" decoding="async" class="aligncenter size-large wp-image-3355" src="https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_6428-1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_6428-1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_6428-1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_6428-1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_6428-1-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_6428-1-2048x1365.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p><img decoding="async" class="aligncenter wp-image-3218 size-large" src="https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_1530-1024x682.jpg" alt="" width="1024" height="682" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_1530-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_1530-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_1530-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_1530-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2022/12/IMG_1530-2048x1365.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img decoding="async" class="aligncenter wp-image-3219 size-large" src="https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0041_edited-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0041_edited-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0041_edited-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0041_edited-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0041_edited-1536x1025.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0041_edited-2048x1367.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. served as the Prime Consultant on this TFC 20-21DM project to implement additional deferred maintenance upgrades at the Brown-Heatly State Office Building, now home to the Texas Department of Family and Protective Services (DFPS).  The project scope included the development of a multidiscipline facility assessment report to identify existing building maintenance deficiencies and prioritize recommendations and corrective actions.</p>
<p>Major scope of work items for the project design included replacement of 191 VAV air terminals across three levels, new chilled water, condenser water and heating water pumps, new domestic water booster pumps, new roofing and building envelope upgrades, replacement of all life safety fans, restroom and locker room plumbing and architectural finish upgrades, redesign of select fire sprinkler piping, and new fire pumps.</p>
<p>Project Title: Brown-Heatly Building 18-19 DM Upgrades (Phase 2)</p>
<p>Project Location: Austin, Texas</p>
<p>Owner:  The State of Texas</p>
<p>Project Size: 258,915 SF</p>
<p>Total Project Cost: $9,407,320</p>
<p>MEP Role: Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Brown-Heatly Building 18-19 DM Upgrades (Phase 1)</title>
		<link>https://www.mepengineering.com/brown-heatly-building-18-19-dm-upgrades-phase-1/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Tue, 13 Dec 2022 01:28:11 +0000</pubDate>
				<category><![CDATA[Government]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=3206</guid>

					<description><![CDATA[MEP Engineering, Inc. served as the Prime Consultant on this TFC 18-19DM project to implement deferred maintenance upgrades at the Brown-Heatly State Office Building, now home to the Texas Department of Family and Protective Services (DFPS).  The project scope included the development of a multidiscipline facility assessment report to identify existing building maintenance deficiencies and<br><a class="moretag" href="https://www.mepengineering.com/brown-heatly-building-18-19-dm-upgrades-phase-1/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-3211 size-large" src="https://www.mepengineering.com/wp-content/uploads/2022/12/Front-Door-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/Front-Door-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/Front-Door-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/Front-Door-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/Front-Door-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2022/12/Front-Door-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-3212 size-large" src="https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-3-1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-3-1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-3-1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-3-1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-3-1-1536x1025.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-3-1-2048x1366.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-3213 size-large" src="https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-1-1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-1-1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-1-1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-1-1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-1-1-1536x1025.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2022/12/Photo-1-1-2048x1367.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. served as the Prime Consultant on this TFC 18-19DM project to implement deferred maintenance upgrades at the Brown-Heatly State Office Building, now home to the Texas Department of Family and Protective Services (DFPS).  The project scope included the development of a multidiscipline facility assessment report to identify existing building maintenance deficiencies and prioritize recommendations and corrective actions.</p>
<p>Major scope of work items for the project design included replacement of 27 central-station air handling units, 179 VAV air terminals across four floors, life safety control dampers throughout the building, and BAS controls upgrades for improved indoor air quality.  Interior architectural renovations were also designed to bring the main entrance vertical openings in compliance with current life safety codes.  Finally, this project also included minor deferred maintenance items at the adjacent Robert D. Moreton Building (RDM) and DSHS Services Building (DHSB).</p>
<p>Project Title: Brown-Heatly Building 18-19 DM Upgrades (Phase 1)</p>
<p>Project Location: Austin, Texas</p>
<p>Owner:  The State of Texas</p>
<p>Project Size: 258,915 SF</p>
<p>Total Project Cost: $12,873,688</p>
<p>MEP Role: Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin &#8211; Chemical &#038; Petroleum Engineering (CPE) Makeup Air Upgrades</title>
		<link>https://www.mepengineering.com/3117-2/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Mon, 12 Dec 2022 21:42:43 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=3117</guid>

					<description><![CDATA[Originally constructed in 1986, the Chemical and Petroleum Engineering building houses offices, classrooms, and over 40,000 square feet of laboratory space. The existing CPE laboratory research building was experiencing high humidity levels and negative building pressurization.  MEP designed an innovative design solution to incorporate 160,000 CFM of new outside air handling units on the roof<br><a class="moretag" href="https://www.mepengineering.com/3117-2/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-3120 size-full" src="https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0234-1.jpg" alt="" width="2048" height="1365" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0234-1.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0234-1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0234-1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0234-1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0234-1-1536x1024.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright wp-image-3121 size-full" src="https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0263-scaled.jpg" alt="" width="2560" height="1707" srcset="https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0263-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0263-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0263-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0263-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0263-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2022/12/DSC_0263-2048x1365.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p>&nbsp;</p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>Originally constructed in 1986, the Chemical and Petroleum Engineering building houses offices, classrooms, and over 40,000 square feet of laboratory space. The existing CPE laboratory research building was experiencing high humidity levels and negative building pressurization.  MEP designed an innovative design solution to incorporate 160,000 CFM of new outside air handling units on the roof with exterior ductwork routed down the side of the building façade.  This scope includes a new steam to hydronic hot water heat exchanger and distribution pumps to provide preheat and reheat at the OAHUs.  In addition, portions of fifteen (15) interior air handling units were modified to replace chilled water and steam coil sections that have degraded beyond their useful life.</p>
<p>Project Title:  Chemical &amp; Petroleum Engineering (CPE) Makeup Air Upgrades</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas</p>
<p>Project Size:  225,913 SF</p>
<p>Total Project Cost:  $6,021,000</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>William P. Clements Building Central Plant Improvements</title>
		<link>https://www.mepengineering.com/william-p-clements-building-central-plant-improvements/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Mon, 11 May 2020 17:12:35 +0000</pubDate>
				<category><![CDATA[Government]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=1966</guid>

					<description><![CDATA[MEP Engineering, Inc. served as the prime consultant on this complete redesign of the existing 1,400-ton WPC central plant.  Located in the Texas Capital Complex, the William P. Clements State Office Building is home to several high-profile state agencies including the Office of the Attorney General.  This challenging project included removal of three existing chillers,<br><a class="moretag" href="https://www.mepengineering.com/william-p-clements-building-central-plant-improvements/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2139" src="https://www.mepengineering.com/wp-content/uploads/2020/04/Raised-Angle-Corner-JSR-Edit-2-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/Raised-Angle-Corner-JSR-Edit-2-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/Raised-Angle-Corner-JSR-Edit-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/Raised-Angle-Corner-JSR-Edit-2-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/Raised-Angle-Corner-JSR-Edit-2-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/Raised-Angle-Corner-JSR-Edit-2.jpg 1566w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1968" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0119_edited-scaled.jpg" alt="" width="2560" height="1702" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0119_edited-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0119_edited-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0119_edited-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0119_edited-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0119_edited-1536x1021.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0119_edited-2048x1362.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1967" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0148_edited-scaled.jpg" alt="" width="2560" height="1703" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0148_edited-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0148_edited-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0148_edited-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0148_edited-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0148_edited-1536x1022.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0148_edited-2048x1363.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1969" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0138_edited-scaled.jpg" alt="" width="2560" height="1702" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0138_edited-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0138_edited-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0138_edited-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0138_edited-768x510.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0138_edited-1536x1021.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0138_edited-2048x1361.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1971" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0159_edited-scaled.jpg" alt="" width="2560" height="1702" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0159_edited-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0159_edited-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0159_edited-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0159_edited-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0159_edited-1536x1021.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0159_edited-2048x1362.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. served as the prime consultant on this complete redesign of the existing 1,400-ton WPC central plant.  Located in the Texas Capital Complex, the William P. Clements State Office Building is home to several high-profile state agencies including the Office of the Attorney General.  This challenging project included removal of three existing chillers, and replacement with two new 750-ton high-efficiency centrifugal chillers.  The existing primary/secondary system consisted of five CHW pumps and three CW pumps with no redundancy.  MEP’s new design features a variable primary flow system requiring only three CHW pumps and three CW pumps, each with N+1 redundancy.   HVAC controls were completely upgraded to DDC, including chiller plant optimization controls for greatly improved plant efficiencies and variable flow condenser water pumping.  MEP provided detailed mechanical and electrical engineering guidance to facilitate temporary cooling equipment installation with minimal building downtime. Due to severe access constraints at the existing basement machine room, MEP’s innovative design approach called for disassembly and reassembly of both new chillers, after being carefully transported in pieces through a new floor penetration conveniently located above the existing chiller room.</p>
<p>Project Title:  William P. Clements Building (WBC) Tower Central Plant Improvements</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The State of Texas</p>
<p>Project Size:  473,338 SF</p>
<p>Total Project Cost:  $3,688,000</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin &#8211; Winship Drama Building HVAC &#038; Electrical Renewal</title>
		<link>https://www.mepengineering.com/the-university-of-texas-winship-drama-building-hvac-electrical-renewal-phase-iii/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Fri, 08 May 2020 22:09:30 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=1950</guid>

					<description><![CDATA[Originally constructed in 1961, F. Loren Winship Drama Building is home to the UT Department of Theater and Dance. The university’s project goal was to replace/renew all major mechanical and electrical systems within the building over three summer construction phases. MEP Engineering, Inc. served as the prime professional service provider. Phase 1 scope included the<br><a class="moretag" href="https://www.mepengineering.com/the-university-of-texas-winship-drama-building-hvac-electrical-renewal-phase-iii/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-3345" src="https://www.mepengineering.com/wp-content/uploads/2020/05/DSCN0051_edited2-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/05/DSCN0051_edited2-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/05/DSCN0051_edited2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/05/DSCN0051_edited2-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/05/DSCN0051_edited2-1536x1025.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/05/DSCN0051_edited2-2048x1367.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1954" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0060_edit-2.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0060_edit-2.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0060_edit-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0060_edit-2-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0060_edit-2-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0060_edit-2-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1956" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0019_edit-2.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0019_edit-2.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0019_edit-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0019_edit-2-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0019_edit-2-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0019_edit-2-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1958" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0033_edit-2.jpg" alt="" width="2048" height="1361" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0033_edit-2.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0033_edit-2-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0033_edit-2-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0033_edit-2-768x510.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0033_edit-2-1536x1021.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1960" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046_edit-2.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046_edit-2.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046_edit-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046_edit-2-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046_edit-2-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046_edit-2-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>Originally constructed in 1961, F. Loren Winship Drama Building is home to the UT Department of Theater and Dance. The university’s project goal was to replace/renew all major mechanical and electrical systems within the building over three summer construction phases. MEP Engineering, Inc. served as the prime professional service provider.</p>
<ul>
<li>Phase 1 scope included the replacement of all existing electrical distribution, alongside the two main 12.5kV transformers, double-ended switchgear, ATS and select main feeder and branch circuit panelboards.</li>
<li>Phase 2 scope included replacement of three air handling units, as well as the existing chilled water piping, steam piping, and piping appurtenances, which were reconfigured based on the new unit structure. MEP also replaced sump pumps, a domestic hot water generator, and updated electrical room ventilation. Additional scope included upgrades to portions of electrical service, branch circuit panels, VFDs, branch circuit wiring, and LED lighting improvements.</li>
<li>Phase 3 scope included removal of four existing air handlers, located on a small, cramped platform, and replacing them with a new roof mounted air handler and steam reheat terminal. This phase also replaced two AHUs in a crowded basement with a new double duct, field-constructed unit.</li>
</ul>
<p>MEP developed construction phasing plans to allow multiple summer dance camps to proceed with minimal effect on youth campers or the construction schedule.</p>
<p>Project Title:  Winship Drama Bldg. HVAC &amp; Elect. Renewal</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  University of Texas at Austin</p>
<p>Project Size:  108,000 SF</p>
<p>Total Project Cost:  $6,273,305 (All Phases)</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin – Jackson Geological Building HVAC Replacement</title>
		<link>https://www.mepengineering.com/university-of-texas-at-austin-jackson-geological-building-hvac-replacement/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Sat, 18 Apr 2020 22:26:41 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=506</guid>

					<description><![CDATA[MEP Engineering, Inc. served as the prime professional service provider on this project to replace four air handling units (230,100 CFM total), two building chilled water pumps, DDC controls, the main electrical service gear and primary transformers, and existing panelboards.  Additional scope of work included replacement of building laboratory exhaust fans (57,525 CFM total), new<br><a class="moretag" href="https://www.mepengineering.com/university-of-texas-at-austin-jackson-geological-building-hvac-replacement/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"><img loading="lazy" decoding="async" class="alignright size-large wp-image-2230" src="https://www.mepengineering.com/wp-content/uploads/2020/04/01-UT-JGB_DSCN5314-2-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/01-UT-JGB_DSCN5314-2-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/01-UT-JGB_DSCN5314-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/01-UT-JGB_DSCN5314-2-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/01-UT-JGB_DSCN5314-2-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/01-UT-JGB_DSCN5314-2.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2232" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5316-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5316-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5316-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5316-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5316-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5316-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2234" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5329-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5329-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5329-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5329-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5329-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5329-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2242" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5343-1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5343-1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5343-1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5343-1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5343-1-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5343-1-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2238" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5338-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5338-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5338-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5338-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5338-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5338-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2233" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5325-1024x682.jpg" alt="" width="1024" height="682" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5325-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5325-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5325-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5325-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5325-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2235" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5333-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5333-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5333-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5333-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5333-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5333-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2237" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5336-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5336-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5336-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5336-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5336-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5336-2048x1366.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2239" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5335-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5335-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5335-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5335-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5335-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5335-2048x1366.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2231" src="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5318-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5318-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5318-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5318-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5318-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/UT-JGB_DSCN5318-2048x1366.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2258" src="https://www.mepengineering.com/wp-content/uploads/2020/05/UT-JGB_DSCN5349-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/05/UT-JGB_DSCN5349-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/05/UT-JGB_DSCN5349-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/05/UT-JGB_DSCN5349-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/05/UT-JGB_DSCN5349-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/05/UT-JGB_DSCN5349.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. served as the prime professional service provider on this project to replace four air handling units (230,100 CFM total), two building chilled water pumps, DDC controls, the main electrical service gear and primary transformers, and existing panelboards.  Additional scope of work included replacement of building laboratory exhaust fans (57,525 CFM total), new Phoenix lab controls, additional electrical capacity for select Level 5 and 6 laboratories, and improvements to the outside air system to correct negative building pressurization issues.</p>
<p>Originally constructed in 1967, Jackson Geological Sciences Building is home to the University of Texas Jackson School of Geosciences.  MEP performed an initial facilities programming report to evaluate a number of options for upgrading the aging infrastructure.  Based on this study, it was determined that more than a direct replacement was needed to allow for future growth.  MEP developed an innovate redesign of the building HVAC and electrical systems, reconfiguring the gear layouts and creating a new mezzanine level for installation of hot deck air handling units above the new cold deck air handling units.</p>
<p>Project Title:  Jackson Geological Building HVAC &amp; Electrical Renewal</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas at Austin</p>
<p>Project Size:  152,000 SF</p>
<p>Total Project Cost:  $5,100,000</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Robert E. Johnson Building Central Plant Improvements</title>
		<link>https://www.mepengineering.com/1785-2/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Wed, 15 Apr 2020 20:00:06 +0000</pubDate>
				<category><![CDATA[Government]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=1785</guid>

					<description><![CDATA[MEP Engineering, Inc. served as the Prime Consultant on this upgrade to the existing 1,000-ton REJ central plant.  Across from the State Capital, the Robert E. Johnson State Office Building provides critical support of the Texas Legislature, particularly during the biennial legislative sessions.  The project included replacement of the existing cooling towers, condenser water pumps,<br><a class="moretag" href="https://www.mepengineering.com/1785-2/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2142" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSCN0053_edited-2-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSCN0053_edited-2-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSCN0053_edited-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSCN0053_edited-2-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSCN0053_edited-2-1536x1025.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSCN0053_edited-2.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1790" src="https://www.mepengineering.com/wp-content/uploads/2020/04/1-REJ-scaled.jpg" alt="" width="2560" height="1704" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/1-REJ-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/1-REJ-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/1-REJ-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/1-REJ-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/1-REJ-1536x1022.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/1-REJ-2048x1363.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1791" src="https://www.mepengineering.com/wp-content/uploads/2020/04/2-REJ-scaled.jpg" alt="" width="2560" height="1701" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/2-REJ-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/2-REJ-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/2-REJ-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/2-REJ-768x510.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/2-REJ-1536x1021.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/2-REJ-2048x1361.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1792" src="https://www.mepengineering.com/wp-content/uploads/2020/04/3-REJ-scaled.jpg" alt="" width="2560" height="1702" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/3-REJ-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/3-REJ-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/3-REJ-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/3-REJ-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/3-REJ-1536x1021.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/3-REJ-2048x1362.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1793" src="https://www.mepengineering.com/wp-content/uploads/2020/04/4-REJ-scaled.jpg" alt="" width="2560" height="1702" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/4-REJ-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/4-REJ-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/4-REJ-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/4-REJ-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/4-REJ-1536x1021.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/4-REJ-2048x1362.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1794" src="https://www.mepengineering.com/wp-content/uploads/2020/04/5-REJ-scaled.jpg" alt="" width="2560" height="1702" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/5-REJ-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/5-REJ-300x199.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/5-REJ-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/5-REJ-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/5-REJ-1536x1021.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/5-REJ-2048x1362.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. served as the Prime Consultant on this upgrade to the existing 1,000-ton REJ central plant.  Across from the State Capital, the Robert E. Johnson State Office Building provides critical support of the Texas Legislature, particularly during the biennial legislative sessions.  The project included replacement of the existing cooling towers, condenser water pumps, controls, and all condenser water piping.  A two-phase design implementation allowed for installation of temporary chiller equipment for reliable cooling throughout.  MEP also engineered upgrades to the backup cooling and electrical power systems, adding a new 120-ton air-cooled chiller and 300kW natural gas generator with ATS.  While not originally included in the project scope, MEP recommend implementation of these creative solutions to address several existing operational issues.  Four new stainless-steel cooling tower cells (1,000 GPM each) were installed on an elevated structural steel platform, allowing for improved maintenance access and N+1 redundancy.  Five new CW pumps and two new CHW pumps were installed in a reduced footprint arrangement.  New DDC controls were installed to serve all new equipment.  Finally, the existing central plant roof was removed and replaced as part of a completely new roof level MEP equipment layout.</p>
<p>Project Title:  Robert E. Johnson (REJ) Central Plant Improvements</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The State of Texas</p>
<p>Project Size:  307,090 SF</p>
<p>Total Project Cost:  $4,170,000</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Marine Science Institute &#8211; Main Wet/Dry Laboratory HVAC Renewal</title>
		<link>https://www.mepengineering.com/msi-main-wet-dry-laboratory-hvac-renewal/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Fri, 27 Mar 2020 19:56:08 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<category><![CDATA[Renovations]]></category>
		<category><![CDATA[Science & Technology]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=1773</guid>

					<description><![CDATA[MEP Engineering, Inc. served as the prime professional services provider on this major HVAC renovation project.  Originally constructed in 1971, the Main Wet/Dry Lab Building (S13) serves as the primary research facility on the UT Marine Science Institute campus.  The scope included installation of seven air handling units (60,900 CFM total), five laboratory exhaust fans<br><a class="moretag" href="https://www.mepengineering.com/msi-main-wet-dry-laboratory-hvac-renewal/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider">  <img loading="lazy" decoding="async" class="alignnone size-full wp-image-1990" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0132.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0132.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0132-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0132-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0132-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0132-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1991" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0115.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0115.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0115-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0115-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0115-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0115-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1992" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0087.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0087.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0087-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0087-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0087-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0087-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1993" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0028.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0028.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0028-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0028-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0028-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0028-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1994" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0031.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0031.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0031-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0031-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0031-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0031-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1995" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0034.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0034.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0034-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0034-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0034-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0034-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1996" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0043.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0043.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0043-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0043-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0043-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0043-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1997" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0046-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1998" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0105.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0105.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0105-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0105-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0105-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0105-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1999" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0063.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0063.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0063-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0063-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0063-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0063-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-2000" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0065.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0065.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0065-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0065-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0065-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0065-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-2001" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0080.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0080.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0080-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0080-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0080-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0080-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-2002" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0050.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0050.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0050-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0050-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0050-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0050-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-2003" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0047.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0047.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0047-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0047-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0047-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0047-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-2004" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0071.jpg" alt="" width="2048" height="1362" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0071.jpg 2048w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0071-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0071-1024x681.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0071-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0071-1536x1022.jpg 1536w" sizes="auto, (max-width: 2048px) 100vw, 2048px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. served as the prime professional services provider on this major HVAC renovation project.  Originally constructed in 1971, the Main Wet/Dry Lab Building (S13) serves as the primary research facility on the UT Marine Science Institute campus.  The scope included installation of seven air handling units (60,900 CFM total), five laboratory exhaust fans (37,000 CFM total), three heating water boilers, two heating water pumps, two condenser water pumps, and three instantaneous, gas-fired domestic water heaters.  The chemical fume hood and laboratory exhaust system was completely reengineered into a manifolded system with airflow-tracking supply and exhaust valves to comply with NFPA 45.  The existing steam boiler system was replaced with a hydronic heating water design for easier maintenance and tighter temperature and humidity conditions.  New DDC controls were installed, along with a new central plant refrigeration exhaust system.  Construction was interrupted in late August 2017 by the nearby landfall of Hurricane Harvey, a Category 4 storm.  MEP and the general contractor worked closely with UT for months to assist with campus restoration efforts, resulting in the additional replacement of two existing cooling towers.</p>
<p>Project Title:  Main Wet/Dry Laboratory HVAC Renewal</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas</p>
<p>Project Size:  48,020 SF</p>
<p>Total Project Cost:  $5,663,000</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>TCEQ Building A Central Plant Upgrades</title>
		<link>https://www.mepengineering.com/tceq-building-a-central-plant-upgrades/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Mon, 23 Mar 2020 15:39:27 +0000</pubDate>
				<category><![CDATA[Government]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=2831</guid>

					<description><![CDATA[MEP Engineering, Inc. served as the Prime Consultant on this project to upgrade to the existing central plant on the Texas Commission on Environmental Quality’s North Austin campus. The scope included upgrading the central plant’s existing HVAC equipment including replacement of the thermal energy storage system, air-cooled chiller, cooling tower, CW &#38; CHW piping and<br><a class="moretag" href="https://www.mepengineering.com/tceq-building-a-central-plant-upgrades/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2833" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_87-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_87-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_87-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_87-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_87-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_87.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2834" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_46-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_46-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_46-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_46-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_46-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_46.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2835" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_57_2-1024x682.jpg" alt="" width="1024" height="682" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_57_2-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_57_2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_57_2-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_57_2-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_57_2.jpg 1877w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2836" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_62_1-1024x682.jpg" alt="" width="1024" height="682" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_62_1-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_62_1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_62_1-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_62_1-1536x1023.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_62_1.jpg 1997w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2837" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_45-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_45-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_45-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_45-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_45-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_45.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2838" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_33_1-1024x682.jpg" alt="" width="1024" height="682" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_33_1-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_33_1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_33_1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_33_1-1536x1023.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_33_1.jpg 1993w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2840" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_22-1-1024x682.jpg" alt="" width="1024" height="682" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_22-1-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_22-1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_22-1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_22-1-1536x1023.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_22-1.jpg 1956w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2841" src="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_21_1-1024x682.jpg" alt="" width="1024" height="682" srcset="https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_21_1-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_21_1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_21_1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_21_1-1536x1023.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2021/07/DSC_21_1.jpg 1987w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. served as the Prime Consultant on this project to upgrade to the existing central plant on the Texas Commission on Environmental Quality’s North Austin campus. The scope included upgrading the central plant’s existing HVAC equipment including replacement of the thermal energy storage system, air-cooled chiller, cooling tower, CW &amp; CHW piping and pumps, and heating water boiler.</p>
<p>Project Title:  TCEQ Building A Central Plant Upgrades</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The State of Texas</p>
<p>Project Size:  196,000 SF</p>
<p>Total Project Cost:  $1,573,000</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UT-Austin – Townes Hall HVAC Renewal</title>
		<link>https://www.mepengineering.com/university-of-texas-at-austin-townes-hall-hvac-renewal-phase-iii/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Fri, 30 Aug 2019 22:46:59 +0000</pubDate>
				<category><![CDATA[Higher Education]]></category>
		<category><![CDATA[Renovations]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=534</guid>

					<description><![CDATA[Originally constructed in 1952, Townes Hall is home to the University of Texas School of Law.  The university’s project goal was to replace/renew all major mechanical and electrical systems within the building over three summer construction phases. MEP Engineering, Inc. served as the prime professional service provider. Phase 1 scope of work included the replacement<br><a class="moretag" href="https://www.mepengineering.com/university-of-texas-at-austin-townes-hall-hvac-renewal-phase-iii/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-3340" src="https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph1-4-1024x768.jpg" alt="" width="1024" height="768" srcset="https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph1-4-1024x768.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph1-4-300x225.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph1-4-768x576.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph1-4-1536x1152.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph1-4-2048x1536.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-3341" src="https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-1-1024x768.jpg" alt="" width="1024" height="768" srcset="https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-1-1024x768.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-1-300x225.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-1-768x576.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-1-1536x1152.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-1-2048x1536.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-3342" src="https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-2-1024x768.jpg" alt="" width="1024" height="768" srcset="https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-2-1024x768.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-2-300x225.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-2-768x576.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-2-1536x1152.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/08/TNH-Ph-3-2-2048x1536.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>Originally constructed in 1952, Townes Hall is home to the University of Texas School of Law.  The university’s project goal was to replace/renew all major mechanical and electrical systems within the building over three summer construction phases. MEP Engineering, Inc. served as the prime professional service provider.</p>
<ul>
<li>Phase 1 scope of work included the replacement of five legacy multi-zone and constant-volume AHUs with six variable speed AHU systems, including preconditioning outside air coils for improved humidity control within the building.</li>
<li>Phase 2 scope of work included the replacement of four legacy multi-zone AHUs with six variable speed hot and cold deck AHU systems, including preconditioning outside air coils for improved humidity control within the building.  Additional scope of work included significant LED lighting and lighting control upgrades within the main auditorium.</li>
<li>Phase 3 scope of work included the replacement of two hot/cold deck AHU’s and six single zone AHUs (84,800 CFM total) located in a single mechanical room. MEP’s innovative design replaced the eight existing AHUs with four larger units: two hot and two cold deck AHUs. Additionally, new air terminals were added within the mechanical room to provide zone control to the existing low pressure zone ductwork. The original aged electrical distribution equipment, including panelboards, transformers &amp; branch circuit wiring in the areas served by AHUs, was replaced, and the electrical grounding systems were upgraded.</li>
</ul>
<p>MEP worked closely with the university project management team to develop outage phasing plans as part of the bid documents, limiting both HVAC &amp; electrical building outages and costly off-hour contractor work requirements. As a result of MEP’s redesign efforts, significant energy efficiency improvements were implemented along with improved equipment maintenance access.</p>
<p>Project Title:  Townes Hall HVAC Renewal</p>
<p>Project Location:  Austin, Texas</p>
<p>Owner:  The University of Texas at Austin</p>
<p>Project Size:  167,000 SF</p>
<p>Total Project Cost:  $5,490,000 (All Phases)</p>
<p>MEP Role:  Prime Consultant</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing Engineering</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
