<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Worship &#8211; MEP Engineering</title>
	<atom:link href="https://www.mepengineering.com/category/worship/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.mepengineering.com</link>
	<description></description>
	<lastBuildDate>Thu, 20 Apr 2023 16:27:52 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.mepengineering.com/wp-content/uploads/2022/10/cropped-NewLogoFavicon-32x32.png</url>
	<title>Worship &#8211; MEP Engineering</title>
	<link>https://www.mepengineering.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Community Bible Church</title>
		<link>https://www.mepengineering.com/community-bible-church/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 08:52:28 +0000</pubDate>
				<category><![CDATA[Worship]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=804</guid>

					<description><![CDATA[MEP Engineering, Inc. provided full service design and construction administration for Community Bible Church’s new 3,200 seat sanctuary, on their existing church campus facility, located in San Antonio, Texas. This project consisted of a new sanctuary, lobby, nursery, audio/video suite, rehearsal room, music department, fine arts department, shop areas, classrooms, and children&#8217;s church. The renovations<br><a class="moretag" href="https://www.mepengineering.com/community-bible-church/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img fetchpriority="high" decoding="async" class="aligncenter size-large wp-image-2825" src="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0230.1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0230.1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0230.1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0230.1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0230.1-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0230.1-2048x1366.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img decoding="async" class="aligncenter size-large wp-image-2826" src="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0237.1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0237.1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0237.1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0237.1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0237.1-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0237.1-2048x1365.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img decoding="async" class="aligncenter size-large wp-image-2827" src="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0242.1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0242.1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0242.1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0242.1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0242.1-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0242.1-2048x1365.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2828" src="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0248.1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0248.1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0248.1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0248.1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0248.1-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0248.1-2048x1366.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2829" src="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0212.1-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0212.1-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0212.1-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0212.1-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0212.1-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2019/05/DSC_0212.1-2048x1365.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>MEP Engineering, Inc. provided full service design and construction administration for Community Bible Church’s new 3,200 seat sanctuary, on their existing church campus facility, located in San Antonio, Texas.</p>
<p>This project consisted of a new sanctuary, lobby, nursery, audio/video suite, rehearsal room, music department, fine arts department, shop areas, classrooms, and children&#8217;s church. The renovations included minor modifications as required to connect the additions to the existing facility, plus adding toilet rooms, and renovating the crawler/toddler area.</p>
<p>Project Title:  Community Bible Church</p>
<p>Project Location:  San Antonio, Texas</p>
<p>Owner:  Community Bible Church</p>
<p>Project Size:  3,200 Seats</p>
<p>Total Project Cost:  &#8212;</p>
<p>MEP Role:  Subconsultant</p>
<p>Architect:  RVK Architects</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Oak Hills Church – Crownridge Campus</title>
		<link>https://www.mepengineering.com/oak-hills-church-crownridge-campus/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Sat, 31 Aug 2019 03:59:06 +0000</pubDate>
				<category><![CDATA[Worship]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=815</guid>

					<description><![CDATA[Oak Hills Church’s Crownridge campus, located in San Antonio, Texas, underwent a $24 million renovation, which included an upgrade to 100,000 square foot of the existing church space, as well as a 60,600 square foot addition. This project was designed by RVK Architects, who hired MEP Engineering, Inc. as a subconsultant. As for the renovation,<br><a class="moretag" href="https://www.mepengineering.com/oak-hills-church-crownridge-campus/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/01-RVK_008.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/02-RVK_009.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/03-RVK_010.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/04-RVK_011.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/05-RVK_012.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/06-RVK_013.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/07-RVK_014.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/08-RVK_015.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/09-RVK_016.jpg" /></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>Oak Hills Church’s Crownridge campus, located in San Antonio, Texas, underwent a $24 million renovation, which included an upgrade to 100,000 square foot of the existing church space, as well as a 60,600 square foot addition. This project was designed by RVK Architects, who hired MEP Engineering, Inc. as a subconsultant. As for the renovation, the main focus was on the existing classrooms, as well as the original worship center. The changes included upgrading the HVAC to a newer model, and installing energy efficient lighting. The new worship center seats 2600, and provides some of the most cutting edge technological and audio-visual equipment available. The church now has both video and audio recording capabilities, along with large projection screens for the convenience of all church attendees.</p>
<p>Project Title:  Oak Hills Church – Crown Ridge Campus</p>
<p>Project Location:  San Antonio, Texas</p>
<p>Owner:  Oak Hills Church</p>
<p>Project Size: 160,600 SF</p>
<p>Total Project Cost:  $24,000,000</p>
<p>MEP Role:  Subconsultant</p>
<p>Architect:  RVK Architects</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Oak Hills Church – Alamo Ranch</title>
		<link>https://www.mepengineering.com/oak-hills-church-alamo-ranch/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Sat, 31 Aug 2019 03:55:39 +0000</pubDate>
				<category><![CDATA[Worship]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=806</guid>

					<description><![CDATA[This $8.3 million project includes a new 33,100 square foot church in San Antonio, Texas.  Other components included in this project were classrooms, offices, and gathering spaces.  The sanctuary was designed with a state-of-the-art acoustics system, and can seat up to 800 people. MEP Engineering, Inc. was hired by RVK Architects, and equipped this worship<br><a class="moretag" href="https://www.mepengineering.com/oak-hills-church-alamo-ranch/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/01-RVK_001.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/02-RVK_002.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/03-RVK_003.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/04-RVK_004.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/05-RVK_005.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/06-RVK_006-1.jpg" /><img decoding="async" class="sldimg" src="https://www.mepengineering.com/wp-content/uploads/2019/08/07-RVK_007.jpg" /></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>This $8.3 million project includes a new 33,100 square foot church in San Antonio, Texas.  Other components included in this project were classrooms, offices, and gathering spaces.  The sanctuary was designed with a state-of-the-art acoustics system, and can seat up to 800 people. MEP Engineering, Inc. was hired by RVK Architects, and equipped this worship center with a DX system of 140 cooling tons, and an electric strip heating system.  MEP also designed the lighting system with energy efficient LED lighting throughout.</p>
<p>Project Title:  Oak Hills Church – Alamo Ranch</p>
<p>Project Location:  San Antonio, Texas</p>
<p>Owner:  Oak Hills Church</p>
<p>Project Size:  33,131 SF</p>
<p>Total Project Cost:  $8,300,000</p>
<p>MEP Role:  Subconsultant</p>
<p>Architect:  RVK Architects</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Hill Country Christian School &#8211; Multipurpose Athletic Center</title>
		<link>https://www.mepengineering.com/hill-country-christian-athletics/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Fri, 12 Jul 2019 21:48:44 +0000</pubDate>
				<category><![CDATA[Worship]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=1832</guid>

					<description><![CDATA[Hill Country Christian School of Austin is an independent college-preparatory school located in Cedar Park, Texas. They offer educational opportunities for preschool aged children through twelfth grade. This project, designed by Fields &#38; Associates Architects, was a $6.2 million athletics addition to the existing campus. The athletics facility includes locker rooms, a weight room, gymnasium,<br><a class="moretag" href="https://www.mepengineering.com/hill-country-christian-athletics/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"> <img loading="lazy" decoding="async" class="alignnone size-full wp-image-1837" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0231_edited-2-scaled.jpg" alt="" width="2560" height="1707" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0231_edited-2-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0231_edited-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0231_edited-2-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0231_edited-2-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0231_edited-2-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0231_edited-2-2048x1366.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1835" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0236_edited-2-scaled.jpg" alt="" width="2560" height="1707" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0236_edited-2-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0236_edited-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0236_edited-2-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0236_edited-2-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0236_edited-2-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0236_edited-2-2048x1366.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-1836" src="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0250_edited-2-scaled.jpg" alt="" width="2560" height="1705" srcset="https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0250_edited-2-scaled.jpg 2560w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0250_edited-2-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0250_edited-2-1024x682.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0250_edited-2-768x511.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0250_edited-2-1536x1023.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/04/DSC_0250_edited-2-2048x1364.jpg 2048w" sizes="auto, (max-width: 2560px) 100vw, 2560px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>Hill Country Christian School of Austin is an independent college-preparatory school located in Cedar Park, Texas. They offer educational opportunities for preschool aged children through twelfth grade. This project, designed by Fields &amp; Associates Architects, was a $6.2 million athletics addition to the existing campus. The athletics facility includes locker rooms, a weight room, gymnasium, and a concessions area. It was engineered with future expansion in mind. MEP designed a HVAC system consisting of rooftop units, with a total cooling capacity of 102-tons. The building is equipped with natural gas heat, and energy efficient LED lighting is installed throughout.</p>
<p>Project Title:  Hill Country Christian School &#8211; Multipurpose Athletic Center</p>
<p>Project Location:  Cedar Park, Texas</p>
<p>Owner:  Hill Country Christian School of Austin</p>
<p>Project Size:  23,000 SF</p>
<p>Total Project Cost:  $6,208,550</p>
<p>MEP Role:  Subconsultant</p>
<p>Architect:  Fields &amp; Associates Architects</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Currey Creek New Children’s Building and Worship Center</title>
		<link>https://www.mepengineering.com/currey-creek-new-childrens-building-and-worship-center/</link>
		
		<dc:creator><![CDATA[mepadmin]]></dc:creator>
		<pubDate>Thu, 11 Jul 2019 09:00:28 +0000</pubDate>
				<category><![CDATA[Worship]]></category>
		<guid isPermaLink="false">https://www.mepengineering.com/?p=2351</guid>

					<description><![CDATA[Currey Creek Church, founded in 2001, is a Baptist Church located in Boerne, Texas. The new children’s building and worship center is a two-story 31,153 square foot addition to the existing church facility. The facility was designed by RVK Architects, with MEP Engineering serving as a subconsultant. The first floor includes seven classrooms, as well<br><a class="moretag" href="https://www.mepengineering.com/currey-creek-new-childrens-building-and-worship-center/">+ Read More</a>]]></description>
										<content:encoded><![CDATA[<div class="ast_slide_wrap  "><div class="ast_slider"></p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2353" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-18@-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-18@-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-18@-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-18@-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-18@-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-18@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2354" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-23@-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-23@-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-23@-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-23@-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-23@-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-23@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="aligncenter size-large wp-image-2355" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-7@-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-7@-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-7@-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-7@-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-7@-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-7@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2356" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-9@-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-9@-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-9@-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-9@-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-9@-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-9@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2357" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-8@-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-8@-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-8@-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-8@-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-8@-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-8@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2358" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-6@-1024x687.jpg" alt="" width="1024" height="687" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-6@-1024x687.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-6@-300x201.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-6@-768x515.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-6@-1536x1030.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-6@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2359" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-4@-1024x686.jpg" alt="" width="1024" height="686" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-4@-1024x686.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-4@-300x201.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-4@-768x514.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-4@-1536x1028.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-4@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2360" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-2@-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-2@-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-2@-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-2@-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-2@-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-2@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class="alignright size-large wp-image-2361" src="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-3@-1024x683.jpg" alt="" width="1024" height="683" srcset="https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-3@-1024x683.jpg 1024w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-3@-300x200.jpg 300w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-3@-768x512.jpg 768w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-3@-1536x1024.jpg 1536w, https://www.mepengineering.com/wp-content/uploads/2020/06/Currey-Creek-3@.jpg 1728w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></p>
<p></div></div><script>jQuery(window).on("load", function(){jQuery(".ast_slider").nivoSlider({ effect :"fade", pauseTime: 3000, directionNav: true, manualAdvance:false});   });</script>
<p>Currey Creek Church, founded in 2001, is a Baptist Church located in Boerne, Texas. The new children’s building and worship center is a two-story 31,153 square foot addition to the existing church facility. The facility was designed by RVK Architects, with MEP Engineering serving as a subconsultant. The first floor includes seven classrooms, as well as three nursery/toddler rooms. It also includes a stage for worship, a guitar room, and a coffee bar. The second floor has 12 classrooms, a gathering room, a sound booth, and a green room.</p>
<p>MEP designed HVAC systems consisting of both Split DX and Packaged Roof Top Units totaling 113-tons of cooling capacity with electric heat. An energy efficient enthalpy wheel Heat Recovery Unit provides ventilation air throughout the facility. MEP was also responsible for  the design of an energy efficient LED lighting system throughout the campus addition.</p>
<p>Project Title:  Currey Creek Church – New Children’s Building &amp; Worship Center</p>
<p>Project Location:  Boerne, TX</p>
<p>Owner:  Currey Creek Church</p>
<p>Project Size:  31,153 SF</p>
<p>Total Project Cost:  $6,453,000</p>
<p>MEP Role:  Subconsultant</p>
<p>Architect:  RVK</p>
<p>Services Provided:  Mechanical, Electrical, &amp; Plumbing</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
