Southwest Research Institute Building 168 Laboratory and Office Addition

MEP Engineering provided design and construction services for a four story lab and office addition to an existing electronics research facility on the campus of the world-renowned Southwest Research Institute in San Antonio, Texas. The new addition included offices, electronics laboratories, Secret Compartmentalized Information Facility (SCIF) labs and support areas.

The HVAC scope included replacement of the existing central plant with a new plant to serve both the new addition and the existing building; the new plant included water cooled chillers and gas fired hot water boilers.

MEP Engineering prepared full contract document drawings and specifications in conjunction with DHR Architects.

Project Title:                        SwRI Building 168 Laboratory and Office Addition

Project Location:               San Antonio, Texas

Owner:                                  Southwest Research Institute

Project Size:                        54,000 SF

Total Project Cost:             $11,000,000

Services Provided:            Mechanical, Electrical, & Plumbing Engineering

MEP Role:                            Subconsultant

Architect:                             DHR Architects