Athletic Facilities

Angelo State University - Junell Center

Texas State University System, San Angelo, TX 130000 Sq. Ft.

Leander HS - Performing Arts / Competition Gym Building

Leander ISD, Leander, TX 30000 Sq. Ft.

Vista Ridge High School

Leander ISD, Leander, TX 400000 Sq. Ft.

Farris Football / Soccer Stadium

Northside ISD, San Antonio, TX

Farris Athletic Complex - Natatorium

Northside ISD, San Antonio, TX

LTISD Lake Travis HS Athletic Facility

Lake Travis ISD, Lake Travis, TX

EISD Westlake HS - Athletic Facility #1

Eanes ISD, Westlake, TX

LISD Leander HS Bible Stadium - Media Infrastructure Ph. II

Leander ISD, Leander, TX

NacISD Football Field Lighting

Nacogdoches ISD, Nacogdoches, TX

NacISD Mike Moses IS - New Gym

Nacogdoches ISD, Nacogdoches, TX 9000 Sq. Ft.

NacISD 9th Grade Center & Gym

Nacogdoches ISD, Nacogdoches, TX 118550 Sq. Ft.

AC Bible Stadium - Press Box Revisions

, College Station, TX 2000 Sq. Ft.

SoSAISD South San HS - Gymnasium

South San Antonio ISD, San Antonio, TX 36716 Sq. Ft.

NEISD BAC - Comalander Stadium Lighting

North East ISD, San Antonio, TX

Spectrum Club at Rogers Ranch

Spectrum Clubs, San Antonio, TX 60000 Sq. Ft.

SWTSU Soccer Fields

Texas State University System, San Marcos, TX 1500 Sq. Ft.

NEISD BAC Littleton Gym - Additions & Renovations

North East ISD, San Antonio, TX 6750 Sq. Ft.

NEISD BAC - Comalander Field Lighting

North East ISD, San Antonio, TX

NEISD BAC Phase 3 Baseball Field

North East ISD, San Antonio, TX

NEISD BAC Soccer Fields

North East ISD, San Antonio, TX

Blossom Athletic - Tennis Center

North East ISD, San Antonio, TX 8 Sq. Ft.

Projects

MEP ENGINEERING, INC. has proven expertise in designing facility systems for the following markets:

Details

Vista Ridge High School
Deprecated: Function split() is deprecated in /home/content/34/9860334/html/projects.php on line 230

Vista Ridge High School

  • Owner: Leander ISD
  • Client:
  • Area: 400,000 Sq Ft
  • Construction Cost: $55,000,000
  • MEP Cost: $13,750,000
  • Date Completed: 2/10/2004

New high school featuring a combination earth-coupled water source heat pump and rooftop DX units. Outside air was pretreated using enthalpy heat wheels with supplemental DX cooling. All classrooms were supplied with minimum 15 cfm of outside air per student to comply with then current ASHRAE recommendations for indoor air quality. Plumbing systems included electronic sensors for water closets, urinals and lavatories to conserve water and ensure sanitation. Electrical systems included classroom and athletic field lighting (football, baseball, softball and tennis), power distribution, cable tray systems for all data and communication systems and fire alarm systems. Special systems included dust collection system, welding exhaust system, shop compressed air system, laboratory fume hood exhaust systems, and laboratory compressed air system.

Vista Ridge High School Vista Ridge High School Vista Ridge High School Vista Ridge High School