North East ISD Data Center

MEP Engineering, Inc. was contracted by North East ISD for the renovation and replacement of the electrical and power systems, the HVAC system, as well as fire suppression and ancillary modifications to the existing first floor data center in the NEEC Building.  MEP also did an assessment of the power and cooling systems, backup generation systems, and data cabling, layout and infrastructure.

The replacement of the critical systems were phased in order to keep the data center active during construction and eliminate down time for the district. High efficiency perimeter, underfloor cooling was utilized in addition to cold aisle isolation and separation of power/data rooms.

MEP Engineering, Inc. acted as prime consultant to the owner, coordinating the scope of the architectural consultant, technology consultant and fire protection consultant. Furthermore, MEP has been providing engineering services to North East ISD as a prime consultant and subconsultant for over 15 years.

Project Title:  North East ISD Data Center

Project Location:  San Antonio, Texas

Owner:  North East Independent School District

Project Size:  4,700 SF

Total Project Cost:  $1,110,000

MEP Role:  Subconsultant

Architect:  RVK Architects

Services Provided:  Mechanical, Electrical, & Plumbing Engineering