EISD Operations & Warehouse

MEP Engineering was hired by the project architect, Fields & Associates, Inc. to assist in the completion of two buildings: a warehouse and a departmental building for Eanes district operations staff. The entire project, in total, was comprised of 14,000 sf of space, and was completed in 2017. The elements include in MEP Engineer’s portion of the project were:

  • A spilt DX system with a cooling size of 50 tons
  • A gas furnace heating system with total 660 MBTUH
  • Plumbing systems included domestic cold and hot water, sanitation and gas
  • Electrical systems included classroom, LED common area lighting as well as lighting for the parking lot, and electrical power for both the security gate and security cameras

Project Title:  EISD Ops & Warehouse

Project Location:  Austin, Texas

Owner:  Eanes Independence School District

Project Size:  14,000 SF

Total Project Cost:  —

Services Provided:  Mechanical, Electrical, & Plumbing Engineering

MEP Role:  Subconsultant

Architect:  Fields & Associates Architects