Camp Sayar/Shaheen/Garmsir

MEP Engineering was contracted by ECC to provide design services for HVAC, plumbing, electrical and power systems for new forward operating bases located throughout Afghanistan. Designs included diesel power generation, fuel distribution and stand-alone MEP systems for approximately 60 buildings per site.

MEP Engineering, Inc. acted as a Consultant to the general contractor, who coordinated the construction on-site. Due to the necessity to construct the bases quickly, design and construction of each site was commonly 12 months from beginning to end.

MEP Engineering partnered with the contractor on the following bases:

  • Farah – Camp Sayar (United States Army Corps of Engineers)
  • Balkh – Camp Shaheen (United States Army Corps of Engineers)
  • Helmand – Camp Garmsir (United States Army Corps of Engineers)

Project Title:  Camp Sayar/Shaheen/Garmsir

Project Location:  Afghanistan

Owner:  US Air Force

Project Size:  —

Total Project Cost:  —

MEP Role:  Sub-consultant

Architect:  RVK Architects

Services Provided:  Mechanical, Electrical, & Plumbing Engineering